Control and phase-out dates

Base level:

Average of 1995-97.

Freeze:

July 1, 1999.

50 per cent: reduction

January 1, 2005.

85 per cent: reduction

January 1, 2007.

100 per cent: reduction

January 1, 2010 (with possible essential use exemptions).

 

Base level:

Average of 1995-97.

Freeze:

January 1, 2002.

50 per cent: reduction

January 1, 2005.

100 per cent: reduction

January 1, 2010 (with possible essential use exemptions).

 

 

Base level:

Average of 1998-2000.

20 per cent: reduction

January 1, 2003.

85 per cent: reduction

January 1, 2007.

100 per cent: reduction

January 1, 2010 (with possible essential use exemptions).

 

Base level:

Average of 1998-2000.

85 per cent: reduction

January 1, 2005.

100 per cent: reduction

January 1, 2010 (with possible essential use exemptions).

 

Base level:

Average of 1998-2000.

Freeze:

January 1, 2003.

30 per cent: reduction

January 1, 2005.

70 per cent: reduction

January 1, 2010.

100 per cent: reduction

January 1, 2015 (with possible essential use exemptions).

 

Base level:

Average 2009-10.

Freeze:

January 1, 2013.

10 per cent: reduction

January 1, 2015.

35 per cent: reduction

January 1, 2020.

67.5 per cent reduction

January 1, 2025.

100 per cent: reduction

January 1, 2030.

Allowance of 2.5 per cent of base level consumption when averaged over ten years 2030-40 until January 1, 2040 for servicing of refrigeration and air conditioning equipment existing on 1 January 2030.

 

100 per cent: reduction

January 1, 1996 (with possible essential use exemptions).

 

100 per cent: reduction

January 1, 2002 (with possible essential use exemptions).

 

Base level:

Average of 1995-98

Freeze:

January 1, 2002.

20 per cent: reduction

January 1, 2005.

100 per cent: reduction

January 1, 2015 (with possible critical use exemptions).

 

Base level:

Average HFC for 2020-2022 + 65% of HCFC baseline

Freeze:

January 1, 2024

10 per cent reduction:

January 1, 2029

30 per cent reduction:

January 1, 2035

50 per cent reduction:

January 1, 2040

80 per cent reduction:

January 1, 2045

 

Project Director

Project Director Mr. Md. Ziaul Haque Director Department of Environment & Project Director HCFC Phase-out Management Plan Stage-II UNEP Component Project Detail

Md. Mahiuddin Manik, Project Director, Renewal of Institutional Strengthening for the Phase-out of ODS (Phase-10) Project

Md. Mahiuddin Manik, Project Director, Renewal of Institutional Strengthening for the Phase-out of ODS (Phase-10) Project Md. Mahiuddin Manik, Deputy Director (Coordination) & Project Director Renewal of Institutional Strengthening for the Phase-out of ODS ( Phase-10) Project Detail